Hasco Standard Mold
Hasco Standard Injection Mold
Mould Steel | NAK80, S136, 718H, SKD61 etc |
Plastic Material | PP, PS, PE, PET, TPR, PVC, PA, POM, ABS, PC, PPR, etc.. |
Mould base | LKM, ML, HASCO etc. |
Runner Type | cold/hot runner (point way, side way, follow way, direct gate way) |
Hot runner system | YUDO, D-M-E etc. (customer demand) |
Normalize parts | D-M-E, HASCO, JIS etc. (customer demand) |
Design Software | UG, Pro-E, Solidworks, CAD, etc. |
Dimensions of the mould | We’ll provide for you |
No. of cavity | Single/Multi |
Mould life | 300,000 to 500,000 shots |
Doff way | Auto by ejectors, Doff plates, Air valves etc |
Lead time | 25 – 30 days |
Process | CNC, High speed carve, E.D.M, Wire cut, Drill, Injection etc. |
FAQ
Q1: What kind of steel do you use for plastic mouldings?
A1: We can use any type of steel appointed by customer or popular in the market.
Such as P20, 718, 8407, NAK80, H13, S136, DIN 1.2738, DIN 1.2344, etc.
Q1: How long is the lead-time for a plastic injection mold?
A1: It all depends on the mold’s size and complexity. Normally, the lead time is 25—45days.
If the Plastic Moulds are very simple and in small size, we can work out within 15 days.